Lesson 3 of 17 · 16 min read

STLC — Software Testing Life Cycle

Master the six STLC phases with their activities, entry and exit criteria, and deliverables, and see how STLC relates to the SDLC.

Learning objectives

  • List the six phases of the Software Testing Life Cycle in order
  • Explain entry and exit criteria with practical examples
  • Identify the key deliverables produced in each STLC phase
  • Differentiate between SDLC and STLC

Just as development follows the SDLC, testing follows its own structured process called the Software Testing Life Cycle (STLC). The STLC defines a sequence of phases, each with clear activities, conditions to start and finish, and documents to produce. Following it makes testing systematic, measurable and repeatable instead of random clicking. "Explain the STLC" is one of the most common interview questions for freshers, so learn the phases, their order and their outputs thoroughly.

Entry and Exit Criteria

Before looking at the phases, understand two terms used throughout the STLC:

  • Entry criteria are the conditions that must be true before a phase can start. Example: "The test environment is ready and a stable build has been deployed" must be true before execution starts.
  • Exit criteria are the conditions that must be met before a phase can be considered complete. Example: "All planned test cases are executed and there are no open critical defects."

These criteria prevent wasted effort (testing an unstable build) and premature sign-off (releasing with serious open bugs).

The Six Phases of STLC

1. Requirement Analysis

The test team studies requirement documents or user stories to understand what must be tested. Testers identify testable requirements, raise queries on unclear points, and decide which types of testing are needed (functional, performance, security and so on). An automation feasibility check may also happen here.

  • Entry: requirement documents available, application architecture understood.
  • Exit: queries resolved or logged, testable requirements identified and signed off.
  • Deliverables: requirement query log, list of testable requirements, initial Requirement Traceability Matrix (RTM).

2. Test Planning

The test lead or manager defines the overall approach: scope, objectives, resources, schedule, tools, environments, risks and effort estimation. Roles and responsibilities are assigned.

  • Entry: requirement analysis complete, scope understood.
  • Exit: test plan reviewed and approved by stakeholders.
  • Deliverables: test plan document, effort and cost estimation.

3. Test Case Development

Testers write test scenarios and detailed test cases, prepare test data and, where relevant, automation scripts. Test cases are reviewed by peers or leads, and the RTM is updated to map each requirement to its test cases.

  • Entry: approved test plan, requirements baselined.
  • Exit: test cases reviewed and approved, test data ready.
  • Deliverables: test scenarios, test cases, test data, updated RTM.

4. Test Environment Setup

The environment includes servers, databases, application builds, browsers, devices, network settings and test accounts. It is usually set up by a DevOps or infrastructure team, while testers verify it. This phase often runs in parallel with test case development. Testers perform a quick smoke test to confirm the build is stable enough for detailed testing.

  • Entry: environment requirements documented, test plan available.
  • Exit: environment ready, smoke test passed.
  • Deliverables: ready environment, smoke test results.

5. Test Execution

Testers run test cases, compare actual results with expected results and mark each case as Pass, Fail, Blocked or Not Run. Failures are logged as defects with clear steps and evidence. Fixed defects are retested, and regression testing ensures nothing else broke.

  • Entry: approved test cases, ready environment, smoke test passed.
  • Exit: all planned tests executed, defects logged and tracked, exit criteria from the test plan met.
  • Deliverables: executed test cases with status, defect reports, updated RTM, daily status reports.

6. Test Cycle Closure

The team evaluates whether testing objectives were achieved, analyses metrics such as defect density and test coverage, documents lessons learned and archives test artefacts for future use.

  • Entry: test execution complete, defect status final.
  • Exit: test closure report signed off.
  • Deliverables: test summary report, test closure report, test metrics, lessons learned.

STLC at a Glance

PhaseKey activityMain deliverable
Requirement AnalysisUnderstand and question requirementsQuery log, initial RTM
Test PlanningDefine scope, approach, schedule, resourcesTest plan, estimation
Test Case DevelopmentWrite and review test cases and dataTest cases, test data
Test Environment SetupPrepare and verify environmentReady environment, smoke results
Test ExecutionRun tests, log and retest defectsExecution results, defect reports
Test Cycle ClosureAnalyse results and closeTest closure report
Example: Exit criteria for a train booking release

A team might define test execution exit criteria as: 100% of planned test cases executed, at least 95% passed, zero open Critical or High severity defects, all Medium defects reviewed with the product owner, and payment and booking flows passing on the top five Android devices.

SDLC vs STLC

AspectSDLCSTLC
ScopeEntire software development, from idea to maintenanceOnly the testing activities
GoalBuild and deliver the productValidate and verify the product's quality
Performed byBusiness analysts, architects, developers, testers, operationsMainly the test team
RelationshipThe parent life cycleRuns within and alongside the SDLC
STLC in Agile projects

In Agile, the STLC does not disappear; it becomes compressed. Within a two-week sprint you still analyse the user story, plan lightly, write test cases, check the environment, execute and close, but every phase may take hours instead of weeks and several stories may be in different phases at the same time.

Interview tip

When explaining the STLC, name each phase and mention one deliverable for it. Interviewers look for structured answers, and naming deliverables such as the RTM, test plan and test closure report shows real understanding rather than memorisation.

Key takeaways

  • STLC has six phases: requirement analysis, planning, test case development, environment setup, execution and closure
  • Entry criteria decide when a phase can start; exit criteria decide when it is complete
  • Each phase produces specific deliverables such as the RTM, test plan, test cases and closure report
  • A smoke test confirms the build is stable before full execution begins
  • STLC is a part of the SDLC and is compressed, not removed, in Agile